Please use this identifier to cite or link to this item: http://monografias.ufrn.br/handle/123456789/9147
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorMedina Tapia, Gabriel Ivan-
dc.contributor.authorRufino, Cleydson Tiago Ferreira-
dc.date.accessioned2019-07-04T00:24:18Z-
dc.date.available2019-07-04T00:24:18Z-
dc.date.issued2019-05-31-
dc.identifier20150145726pt_BR
dc.identifier.citationRUFINO, Cleydson Tiago Ferreira. Economic viability analysis of CSP technology in the state of Rio Grande do Norte. 2018. 10 f. TCC (Graduação) - Curso de Engenharia Mecânica, Centro de Tecnologia, Universidade Federal do Rio Grande do Norte, Natal, 2019.pt_BR
dc.identifier.urihttp://monografias.ufrn.br/handle/123456789/9147-
dc.languagept_BRpt_BR
dc.publisherUniversidade Federal do Rio Grande do Nortept_BR
dc.subjectEconomic Viabilitypt_BR
dc.subjectConcentrating Solar Powerpt_BR
dc.subjectRenewable Energypt_BR
dc.titleEconomic viability analysis of CSP technology in the state of Rio Grande do Nortept_BR
dc.typebachelorThesispt_BR
dc.description.resumoThis work presents an economic viability analysis of the installation of solar power plants with Concentrating Solar Power (CSP) for the cities of Assú, Caicó and Mossoró of the state of Rio Grande do Norte in Brazil. The cities chosen have normal direct irradiation above 2,000 kWh/m2/year. The System Advisor Model (SAM) software was used for the simulations. In the analysis have been considered that there is or there is not Thermal Energy Systems (TES). The CSP plants analyzed have been of Parabolic Trough Collector (PTC) technology with dry cooling system without TES and with TES, PTC plants with wet cooling without TES and with TES, Central Receiver System (CRS) technology with dry cooling without TES and with TES and CRS with wet cooling without TES and with TES. The parameters Levelized Cost of Electricity (LCOE), which is the price per kWh of the electric power generated at the plant, and the Solar Multiple (SM), which relates the solar generation with the power generation of the plant, were analyzed. According to the results found, Caicó and Mossoró had better conditions of CSP installation in relation to Assú, however Caicó, does not yet have enough Sistema Interligado Nacional infrastructure to receive CSP plants.pt_BR
dc.publisher.countryBrasilpt_BR
dc.publisher.departmentEngenharia Mecânicapt_BR
dc.publisher.initialsUFRNpt_BR
Appears in Collections:Engenharia Mecânica

Files in This Item:
File Description SizeFormat 
Artigo TCC Cleydson.pdf576,95 kBAdobe PDFThumbnail
View/Open
Ata TCC Cleydson.pdf789,33 kBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.